G.R. No. L-52196. December 14, 1981

CONTINENTAL CEMENT CORPORATION, PETITIONER, VS. HON. COURT OF APPEALS AND MANILA INTEROCEAN LINES, INC., RESPONDENTS.

Decisions / Signed Resolutions December 14, 1981 SECOND DIVISION CONCEPCION JR., J.:
Download PDF


CONCEPCION JR., J.:


This is a petition for certiorari to review the majority
decision of the Court of Appeals promulgated on June 11, 1979 in CA-G.R. No.
59777-R entitled “Continental Cement Corporation, plaintiff-appellant vs.
Manila Interocean Lines, Inc., defendant-appellee,”[1]
affirming the decision of the Court of First Instance of Rizal,
Quezon City, Branch IV, in Civil Case No. 12252, the dispositive part of which reads:

“WHEREFORE, this Court hereby finds the plain­tiff liable
to the defendant and hereby renders judgment ordering the plaintiff to pay the
defendant the following (1) The amount of U.S.$78,017.68 as the balance of the
freight charges due from plain­tiff to the defendant with interest at 6%
computed from November 28, 1967 until fully paid; (2) The amount in Philippine
currency must be computed at the prevailing rate of exchange on the date of
payment; (3) The amount of P25,000 as attorney’s fees is deemed reasonable
compensation in defendant’s favor.

SO ORDERED.

Pasay City, Philippines, July
18, 1975.”
[2]

The motion for reconsideration of Continental Cement Corporation
was denied.[3]

The petitioner Continental Cement Corporation is a domestic
corporation engaged in the manufacture and sale of cement for domestic use and
exportation.

The private respondent Manila Interocean
Lines, Inc. is also a domestic corporation engaged in interocean
shipping.

The petitioner was the awardee or
end-user of heavy machineries and equipment for cement manufacture as
reparations from Japan through the Philippine Reparations Commission.

The private respondent, as a shipping company, was also a re­cipient
of inter-cargo vessels as reparations.

In 1967, the petitioner shipped on board the private respondent’s
vessel M/V “Irene 1,469 packages of cement machineries and equipment,
through the Reparations Commission consisting of machineries and equipment for
a cement plant, all consigned to the Reparations Commission and which arrived
at the Port of Manila on June 20, 1967.

Under the contract of affreightment,[4]
the petitioner was bound to pay freight charges in the amount of about
P300,000.00 including all necessary expenses and normal charges after unloading
at the piers within a period of 120 days from the arrival of the vessel M/V
“Irene” at the Port of Manila on June 20, 1967 with a freight rebate
of not less than 30% on the basic freight rates.

When the shipment arrived in the Port of Manila, a dispute arose
between the petitioner and the private respondent on the time and manner of
payment of the freight charges.

The petitioner demanded that the shipment be unloaded shipside on
barges for delivery to a customs bonded warehouse, invoking the right to the
period of 120 days within which to pay the freight charges.  The private respondent refused to release
said shipment until the full payment of the freight charges.  Hence, the shipment was unloaded ship­side on
the pier, as a result of which stevedoring, arrastre,
storage, conduction and other charges and fees were unduly incurred and accumu­lated.

The private respondent finally decided, after due notice to the
parties concerned by publication, to sell at public auction the re­paration
machineries in the total amount of P573,401.56 plus interest and costs of sale
to cover the alleged unpaid freight charges.

In view thereof, the petitioner Continental Cement Corporation
filed a complaint on July 18, 1968 in the Court of First Instance of Rizal at Quezon City; Branch IV,
against the private respondent, Manila Interocean
Lines, Inc. for damages, seeking the following relief:

“WHEREFORE, it is most respectfully prayed this Hon. Court
that judgment be rendered sentencing defendant to pay plaintiff the sum of
P200,000.00 as actual damages and attorney’s fees of P20,000.00, aside from
costs.

It is likewise respectfully prayed that pending the hearing on
the merits hereof and by reason of the urgency of the relief prayed for, a writ
of prelimi­nary injunction, ex-parte if necessary, or
at least a restraining order, be issued upon filing by herein plaintiff of a
bond in an amount to be determined by this Hon. Court executed in favor of the
defendant con­ditioned for the payment of whatever damages said de­fendant may
sustain should plaintiff be found later as not entitled thereto, commanding
defendants, its agents and/or representatives, to desist and refrain from
conducting and carrying out the sale at public auction of the 1,469 packages of
cement plant machineries and equipment presently located at plaintiff’s bonded
ware­house at the Atlas Textile Mills Compound at Novaliches,
Quezon City starting July 22, 1968 at 10:00 in the
morning and everyday thereafter, until further orders from this Hon. Court, and
to make said injunction permanent.

Plaintiff finally prays for such other and further relief as
this Hon. Court may deem just and equitable in the premises.

Manila, for Quezon City, July 17,
1968.”
[5]

The trial court issued a temporary restraining order to stop the
sale of the machineries at public auction upon the filing by the plaintiff,
petitioner herein, of a bond in the amount of P50,000.00 and set for hearing
the petition for preliminary injunction.[6]

However, before a preliminary injunction
was issued, the parties submitted the following partial compromise agreement:

“COME NOW the parties, plaintiff and defendant Manila Interocean Lines, Inc., by their respective undersigned counsels,
and by way of partial compromise agreement of the subject-matter of this case,
to this Hon. Court respectfully manifest:

“1. That,
defendant Manila Interocean Lines, Inc., claims that the
total freight payable by plaintiff in its favor for the shipment on board its
vessel M/V “Irene” of 1,469 packages of reparations cargo
subject-matter of this case is P573,401.56, plus interest and other charges;

“2. That on
the other hand, herein plaintiff disputes liability for freight charges to the
extent of said amount of P573,401.56, plaintiff maintaining that its liability
for these freight charges is only to the extent of P269,132.58;

“3. That
plaintiff is ready and willing to tender payment as it hereby tenders payment
of said amount of P269,132.58 which it considers as the net undisputed freight
charges subject-matter of this case in favor of the defendant Manila Interocean Lines, Inc., leaving the matter of the balance
from the total amount being claimed by said defendant as hereinabove stated,
subject of final adjudication in this case, without defendant waiving any
defenses and counterclaims which it may have;

“4. That in
consideration of the payment by plain­tiff of the aforesaid amount of P269,132.58,
defendant Manila Interocean Lines, Inc., hereby binds
and obligates itself, simultaneously with the receipt of the payment of said
amount, to issue in favor of the plaintiff the corresponding delivery permits
addressed to and in the form furnished by the Bureau of Customs covering the
aforesaid cargo of 1,469 packages of machineries for a cement plant described
in two (2) bills of lading Nos. MM-2 issued on 
May 29, 1967 and YM-6 issued June 16, 1967 to enable herein plaintiff to
withdraw said cargoes from the customs bonded warehouse where they are present­ly
deposited, without prejudice to the continuation of this action with respect to
the balance of said freight that the parties herein dispute and with prejudice
further to the continuing vitality of any lien which defendant may have on this
cargo.

“WHEREFORE, it is respectfully prayed this Hon. Court that
an order issue approving the foregoing partial compromise agreement and
enjoining the parties herein to adhere strictly to the terms thereof.

“Manila for Quezon City,
November, 1968

“CONTINENTAL CEMENT CORPORATION

“By:

ERIBERTO D. IGNACIO

Counsel for Plaintiff

Rm. 414 Madrigal Building

Escolta,
Manila

“MANILA INTEROCEAN

LINES, INC.

“By:

(Sgd.) Illegible

Counsel for
Defendant

Suite 808, Building
666

T.M. Kalaw
St.,

Ermita,
Manila

“Copy furnished:

Messrs. Manguera
& Associates

Reparations Commission

NMI Building, Buendia
&
Ayala Ave.

Makati,
Rizal
[7]

In its original answer to the petitioner’s complaint filed on
December 22, 1969, the Manila Interocean Lines, Inc.
interposed only a counterclaim for actual and other damages in the amount of
P300,000.00 allegedly because the plaintiff’s suit was unjustified and for
attorney’s fees in the sum of P30,000.00 which the defendant allegedly incurred
by virtue of plaintiff’s unwarranted filing of the complaint.[8]

On February 23, 1971, the defendant Manila Interocean
Lines, Inc. filed a motion for leave to amend the answer allegedly because the
said defendant “had inadvertently failed to include in its answer by way
of counterclaim its claim for P573,401.56 less P269,132.58 as freight
charges.  In the amended answer, the
defendant interposed an additional counterclaim for the balance of the freight
charges.[9]

The amended answer was admitted by the trial court.

At the hearing in the trial court on September 24, 1973, counsels
for both parties made a joint manifestation that the only issue for resolution
of the Court was the counterclaim.  With
the conformity of plaintiff’s counsel, the defendant’s motion to dismiss the
complaint was granted.[10]

With the dismissal of the complaint, the only remaining issue to
be resolved was whether the defendant’s claim for freight charges had been
fully liquidated.

The plaintiff claimed that full payment had been made to the de­fendant
with the acceptance by the latter of P269,132.58 on November 22, 1968.

In support of this claim the plaintiff, petitioner herein,
presented in evidence a voucher marked as Exhibit “6” which showed
that the Manila Interocean Lines, Inc. had received
the sum of P269,132.58 as full payment. 
Above the signature of Atty. Nordy P. Diploma,
counsel and vice-president of Manila Interocean
Lines, Inc. are the following particulars:

a. Full payment
to ANTONIO MARTEL, BOTELHO SHIPPING CO. & MANILA INTEROCEAN LINES for
freight charges on Cement Machineries & Equipment shipped ex. S/S
“Irene”.

The defendant contended that the alleged acknowledgment that the
Manila Interocean Lines, Inc. had received the sum of
P269,132.58 as full payment typewritten in the voucher marked as Exhibit
“6” was an interpolation and therefore spurious.[11]

The trial court concluded, in the light of the evidence adduced
by the parties, that the plaintiff’s claim that full payment had been made was
not substantiated by clear and convincing evidence and that the plaintiff still
owes the defendant the balance on the freight charges as stated in the
defendant’s counterclaim and ordered the plaintiff to pay the defendant the
amount of U.S.$78,017.68 with interest at 6% com­puted from November 28, 1967
until fully paid and the amount of P25,000.00 as attorney’s fees.[12]

The trial court ordered the immediate execution of the judgment
pending appeal.  To stay immediate
execution, the Continental Cement Corporation had to file a supersedeas
bond in the amount of P899,656.18.

The plaintiff Continental Cement Corporation appealed to the
Court of Appeals assigning the following errors:

“1

THE LOWER COURT GRIEVOUSLY ERRED IN NOT FINDING THAT
PLAINTIFF-APPELLANT HAD ALREADY PAID IN FULL THE FREIGHT CHARGES BEING CLAIMED
BY THE DEFENDANT-APPELLEE IN ITS COUNTERCLAIM AGAINST PLAINTIFF-APPELLANT
CONTAINED IN BOTH SAID DEFEND­ANT-APPELLEE’S ORIGINAL AND AMENDED ANSWERS.

“2

ASSUMING HYPOTHETICALLY THAT THE PAYMENT MADE BY
PLAINTIFF-APPELLANT TO DEFENDANT-APPELLEE ON ACCOUNT OF THE FREIGHT CHARGES WAS
NOT BY WAY OF FULL PAYMENT, THE LOWER COURT NEVERTHELESS SERIOUSLY ERRED IN
ORDERING THE PLAIN­TIFF-APPELLANT TO PAY DEFENDANT-APPELLEE AS UNPAID FREIGHT
CHARGES THE AMOUNT OF US$78,017.68 AS SUPPOSED BALANCE OF THE FREIGHT CHARGES
DUE TO THE DEFENDANT-APPELLEE WITH INTEREST THEREON AT SIX PER CENT PER ANNUM
COMPUTED FROM
NOVEMBER 28, 1967
UNTIL FULLY PAID WITH SAID DOLLAR PAYMENT TO BE COMPUTED AT THE PREVAILING RATE
OF EXCHANGE WITH , THE PESO AT THE DATE OF PAYMENT.

“3

THE LOWER COURT THEREBY ERRED IN NOT DISMISSING THE COUNTERCLAIM
IN THE AMENDED ANSWER.”
[13]

The majority of a Division of Five of the Court of Appeals
affirmed in all respects the decision of the trial court.[14]

Hence this petition for certiorari to review the decision
of the majority of the Court of Appeals.

The petitioner contends that the majority of the Division of Five
of the Court of Appeals committed the following errors:

“I

“THE RESPONDENT COURT OF APPEALS THROUGH THE MAJORITY OF THE
SPECIAL DIVISION OF FIVE GRIEVOUSLY ERRED IN ENTIRELY IGNORING AND DISREGARDING
THE INDISPUTABLE EVIDENCE OF FULL PAYMENT BY THE PETITIONER OF THE BALANCE OF
THE UNPAID FREIGHT AND OTHER CHARGES TO PRIVATE RESPONDENT (EXH. 6); NOT­WITHSTANDING
THE FACT THAT THE GENUINE­NESS THEREOF IS ADMITTED, ON THE GROUND THAT ITS
CONTENTS SUPPOSEDLY DID NOT REFLECT THE TRUE INTENT OF THE PARTIES, AGAIN
DESPITE THE OVERWHELMING EVIDENCE TO THE CONTRARY, THEREBY LEADING RES­PONDENT
COURT OF APPEALS INTO AN ERRONEOUS APPRECIATION OF THE EVIDENCE ON RECORD
AMOUNTING TO A SERIOUS ERROR OF LAW;

“II

“ASSUMING PURELY HYPOTHETICALLY, THOUGH NEVERTHELESS
DENYING, AS WE HAVE ABOVE DISCUSSED THAT HEREIN PE­TITIONER STILL OWES PRIVATE
RESPONDENT BY WAY OF BALANCE OF ALLEGED UNPAID FREIGHT AND OTHER CHARGES THE
SUM OF P304,268.98 BEING THE DIFFERENCE OF WHAT PRIVATE RESPONDENT CLAIMS TO BE
THE UNPAID FREIGHT CHARGES OF P573,401.56 LESS P269,132.58 THAT PETITIONER
PAID, RESPONDENT COURT OF APPEALS LIKEWISE GRIEVOUSLY ERRED IN AFFIRMING THE
DECI­SION OF RESPONDENT TRIAL COURT THAT WHAT PETITIONER SHOULD PAY IS
$78,017.68 COM­PUTED IN PHILIPPINE PESOS AT THE PRE­VAILING RATE OF EXCHANGE ON
THE DATE OF PAYMENT OR P899,656.18 AS OF JUNE 14, 1976, NOTWITHSTANDING THE
FACT THAT THE ONLY AMOUNT CLAIMED BY PRIVATE RESPONDENT COMPANY IN THE
ALLEGATIONS AND PRAYER IN BOTH ITS ORIGINAL AND AMENDED COUNTER­CLAIMS (PP.
40-53, REC. ON APP., ANNEX F HEREOF), AND WHAT IT SOUGHT TO PROVE DURING THE
TRIAL IN THE COURT A QUO, BY DOCUMENTARY AND TESTIMONIAL EVIDENCE WAS ONLY
P304,268.98, NOT DOLLAR, THEREBY GROSSLY VIOLATING AND IGNORING THE IM­PERATIVE
MANDATE OF THIS H ON. COURT IN THE LEADING CASE OF MALAYAN INSURANCE CO., INC.
VS. THE MANILA PORT SERVICE, ET AL., L-23128, SEPT. 30, 1978;

“III

“THE RESPONDENT COURT OF APPEALS THEREBY PALPABLY ERRED ON
DECIDING QUES­TIONS OF LAW IN OPEN DISREGARD OF THE ACCEPTED NORMS LAID DOWN BY
THIS HON. COURT IN ITS LEADING DECISIONS WARRANTING
THE REVERSAL OF ITS DECISION ANNEX
“A” HEREOF CONFIRMATORY OF THE APPEALED DECISION OF THE COURT A
QUO.”
[15]

In resolving the issues involved, the following undisputed facts
of record are decisive.

The letter-agreement on the time and manner of payment of the
freight charges is an actionable document attached to the complaint as Annex
“A”.

In its answer the defendant averred that the alleged contract of affreightment (Annex “A”) is null, void,
non-existent and of no effect because (a) the same was subject to plaintiff’s
acceptance which acceptance was never made, and (b) granting, arguendo, plaintiff accepted it, the alleged
Contract of Affreightment to be valid and effective
was still subject to the fulfillment of certain conditions sine qua non,
which conditions were never complied with.[16]

It appears from Annex “A” that the same was confirmed
and accepted by Gregory T. Lim, the then executive vice president of the
plaintiff Continental Cement Corporation.[17]

Moreover, the defendant did not deny under oath the
letter-agreement.  Hence the genuineness
and due execution of said contract of affreightment
had been deemed admitted.[18]

The defendant, Manila Interocean Lines,
Inc. did not allege, much less prove, the “certain conditions sine qua
non
” to which the contract of affreightment
was subject to.

The letter-agreement is a complete contract of affreightment.  There
is no allegation that the same does not express the true intent of the
parties.  Hence the said contract of affreightment is to be considered as containing all such
terms and there can be between the parties no evidence of the terms thereof
other than the contents of the writing.[19]

On the contention of the petitioner that it was entitled to a
rebate of 30% of the basic freight charges, the following provisions of the
letter-agreement, Annex “A”, are pertinent:

“B.
Regardless of whatever Conference Freight Tariff rate you or your Associates
actually have to pay on the shipment of the above cargo on vessels to be
designated by me, I will arrange to give you the following benefits from the
ope­rational profits due to me: –

“1) My basic
freight rate to you will be US$18.90 per Revenue Ton Berth terms on the 6,500
tons of Cement machinery and equipments as per schedule attached plus US$1.00
per re­venue ton Manila surcharge and standard heavy lift and overlength tariff charges, on all these charges, I will
grant you a rebate of thirty (30%) per cent.

“2) US$7.70
per revenue Ton Berth Terms on the 1500 tons of steel products plus US$1.00 per
revenue ton surcharge and standard heavy lift overlength
tariff charges; on all these
charges I will grant you a rebate of 30%.”
[20]

Anent the defendant’s agreement to grant the plaintiff, peti­tioner
herein, a period 120 days credit for payment of the freight due, the following
provision of the letter-agreement, Annex “A” is applicable:

“D.
For payment of freight, it is agreed that you will give me first option to
purchase various stocks of cement and steel belonging to you and your
Associates at such preferred prices and terms that will be considered most
compe
titive in the market, and
which you undertake to match for price and terms.  Should I for any reason be unable to absorb
sufficient quantities of your stocks of cement and steel that you will have
available for me, I will then agree to grant you up to one hundred twenty (120)
days credit for payment of any of your remaining balance of freight due,
calculated from time of arrival of the vessel in Manila.”
[21]

It is a fact that the defendant Manila Interocean
Lines, Inc. reneged on the terms of the contract of affreightment
by demanding full payment of the freight charges before releasing the shipment
to the Continental Cement Corporation. 
In fact, had the petitioner not filed Civil Case No. 12252 of the Court
of First Instance of Rizal, the Manila Interocean Lines, Inc. would have sold at public auction the
shipment to pay the freight charges.  As
a consequence of the breach by the defendant, the petitioner Continental Cement
Corpora­tion had to pay customs storage charges and handling charges in the
total amount of P100,598.46.

It is also a fact that when the original answer was filed on
December 22, 1969 the defendant did not include in its counterclaim the alleged
balance of the freight charges.  It was
only on Feb­ruary 23, 1971, after the lapse of one year and two months, that
the defendant thought of amending its answer to include in the counter­claim
the alleged balance of the freight charges. 
The reason given in the motion for leave to amend the answer was that
the defendant had inadvertently failed to include in the counterclaim in its
answer the claim of P573,401.56 less P269,132.58, the amount paid by the
plaintiff under their November 1968 Partial Compromise Agreement.  It is highly incredible that the defendant
could have overlooked such a large amount demanded in the additional
counterclaim.  The failure of the
defendant to demand in the original answer the alleged balance of the freight
charges supports the contention of the Conti­nental Cement Corporation that its
payment of the amount of P269,132.58 is a full discharge of the liability for
freight charges as clearly indicated in the receipt-voucher, Exhibit
“6”.

Moreover, it is a fact that upon payment by the Continental
Cement Corporation of the P269,132.58 to the Manila Interocean
Lines, Inc. the entire shipment was released to the plaintiff, petitioner
herein.

As counter-claimant, the defendant, Manila Interocean
Lines, Inc. had the burden to prove its claim for the alleged balance of the
freight charges still owed by the Continental Cement Corporation.

Confronted with the receipt-voucher, Exhibit “6”, which
clearly shows full payment by the Continental Cement Corporation of the freight
charges, the Manila Interocean Lines, Inc. averred
that the words indicating full payment were interpolated after the voucher was
signed.  To prove this contention, the
Manila Interocean Lines, Inc. presented as witness
Atty. Nordy P. Diploma who declared that “when I
signed that original it does not seem to bear this Parti­culars.” (p. 20, t.s.n., Feb. 4, 1974)

The defendant contends that the words indicating full payment of
the freight is an interpolation and amounts to a charge of the crime of
falsification committed by the Continental Cement Corpo­ration.  The Manila Interocean
Lines, Inc. has the burden of proving such a serious charge.

The Continental Cement Corporation is presumed to be innocent of
crime or wrong.[22]

Against this presumption and the positive testimony of Danilo A. Morales, executive assistant of Continental
Cement Corporation, that the voucher, Exhibit “6”, represents full
payment of the freight charges to the defendant, (pp. 20-21, t.s.n., January 3, 1974) the Manila Interocean
Lines, Inc. presented only the uncertain testimony of Atty. Nordy
P. Diploma.

The voucher, Exhibit “6” is regular on its face.  There is no indication in the spacing of the
typewritten words acknowledging full payment of the freight charges that said
words were inter­polated.  Indeed, if
said words are eliminated, the voucher would be incomplete.

The private respondent failed to rebut the evidence of the
petitioner that it had fully paid the freight charges.  In view of this finding, it is no longer
necessary to pass upon the other errors assigned in the petition.

WHEREFORE, the decision of the Court of Appeals sought to
be reviewed is hereby SET ASIDE and the decision of the trial court ordering
the Continental Cement Corporation to pay the Manila Inter ocean Lines, Inc.
the sum of US$78,017.68 as the balance of the freight charges with interest at
6% from November 28, 1967 until fully paid and the amount of P25,000.00 as
attorney’s fees is here­by REVERSED and the counterclaim of the defendant,
private respondent herein, is DISMISSED, without pronouncement as to costs.

The supersedeas bond in the amount of
P899,656.18 filed by the petitioner to stay the immediate execution of the
judgment pending appeal is declared CANCELLED.

SO ORDERED.

Barredo, (Chairman), De Castro, Ericta, and Escolin, JJ., concur.

Aquino and
Abad Santos, JJ., no
part.


[1] Rollo, pp. 47-61.

[2] Record on Appeal, pp. 63-64, Rollo, p. 107.

[3] Resolution promulgated on December 12, 1979, Rollo, pp. 72-78.

[4] Letter-Agreement, Annex “A”, Record
on Appeal, pp. 12-17, Rollo, p. 107.

[5] Record on Appeal, pp. 10-11, Rollo, p. 107.

[6] Ibid.,
pp. 23-24, Rollo, p. 107.

[7] Ibid., pp. 25-58, Rollo, p. 107.

[8] Ibid., pp. 29-38, Rollo, p. 107.

[9] Ibid., pp. 40-54, Rollo, p. 107.

[10] Ibid., p. 57, Rollo, p. 107.

[11] Ibid., pp. 58-59, Rollo, p. 107.

[12] Ibid., pp. 62-64, Rollo, p. 107.

[13] Appellant’s Brief, pp. 1-2, Rollo, p. 108.

[14] Rollo, pp. 47-61.

[15] Petition for Review, pp. 7-9, Rollo, pp. 12-14.

[16] Record on Appeal, pp. 29-38, Rollo, p. 107.

[17] Ibid., pp. 12-17.

[18] Section 8, Rule 8, Revised Rules of Court.

[19] Section 7, Rule 130, Revised Rules of Court.

[20] Record on Appeal, pp. 14-15, Rollo, p. 107.

[21] Ibid.,
p. 16, Rollo, p. 107.

[22]
Section 5(a), Rule 132, Revised Rules of Court.