G.R. No. 13210. August 09, 1918

MARIANO LIMJAP, PLAINTIFF AND APPELLEE, VS. J. MACHUCA & CO., DEFENDANT AND APPELLANT.

Decisions / Signed Resolutions August 9, 1918 FISHER, J.:
Download PDF


FISHER, J.:


The defendant company entered into a contract with the plaintiff for the
construction of a mausoleum in the Del Norte cemetery of the city of Manila, at
the price of P7,500 and in accordance with the plans and specifications of
plaintiff’s architect. In one of the specifications of the contract it was
provided that the pedestal of the mausoleum should be made of reinforced
concrete. The defendant constructed the mausoleum; the plaintiff accepted the
work and paid the entire price therefor. At the time of the acceptance of the
work, the sub-base of the mausoleum presented certain crevices or cracks, but
the defendant assured the plaintiff that the pedestal had been constructed of
reinforced concrete in accordance with the specifications of the contract. In
view of this statement, the plainiff, confiding in its truthfulness, accepted
the work and paid the contract price. The statement, however, was not true, as
in fact the pedestal was not constructed of reinforced concrete. After the lapse
of a certain length of time following the delivery and acceptance of the work,
the pedestal commenced to sink and crack, owing to the weakness of its
construction and due to the failure to employ reinforced concrete in the work.
It was then discovered that these defects originated from the defendant’s
failure to comply with the requirement of the contract in respect to the use of
reinforced concrete in the construction of the pedestal. A demand was made upon
the defendant to repair the defects, but it failed and refused to do so. This
action was brought to collect from the defendant the sum of P805, the cost of
the work which the plaintiff would need to have done in order to put the
defective structure, the subject matter of the complaint, into good condition.
The trial judge, who found that the facts in the case were substantially as
above related, rendered judgment in favor of the plaintiff for the amount
claimed. From this judgment the defendant has appealed. In support of its appeal
the defendant company maintains that the lower court erred in holding that, in
conformity with the contract, the delivery to the plaintiff and the acceptance
by him of the work did not entirely relieve it from subsequent liability, and
that the trial court also erred in holding that article 1591 of the Civil Code
was applicable to the case at bar.

Although the defendant filed a motion for a new hearing, founded on the usual
grounds, and entered an exception to the order denying its motion, the evidence
produced before the trial court was not transmitted to the Supreme Court.
Therefore, in considering the questions of law raised by the appellant’s
assignment of errors, we must conclusively assume that the facts are as they are
stated to be in the findings on which the judgment appealed from is based.

The appellant maintains that the trial court erred in not holding that the
delivery and the acceptance of the work and the payment of the price of the
contract are a bar to the institution of this action. We do not agree with this
contention. The lower court found, as proven facts, that in accordance with the
terms of the contract it was the duty of the defendant to construct the pedestal
of the mausoleum of reinforced concrete; that, when the work was delivered, the
defendant informed the plaintiff that it had complied with the specifications of
the contract; that the plaintiff accepted the work, confiding in this statement,
which in reality was not true; that, by reason of the defendant’s not having
constructed the pedestal of reinforced concrete, it gave way, presented fissures
or cracks and ceased to stand level; and that the cost of correcting the defects
and completing the work as it should have been done, in accordance with the
terms of the contract, was the amount awarded in the judgment rendered.

As the breach of the contract which gave rise to these proceedings consisted
in the defendant’s failure to construct the pedestal of the mausoleum of
reinforced concrete, it is evident that the defect in the construction was not
apparent at the time of the delivery and acceptance of the work. Therefore the
plaintiff was justified in relying on the defendant’s statement that it had
complied with the contract in regard to the employment of reinforced concrete as
specified therein. Though it is a general rule that the acceptance of a building
by the owner without protest or objection is equivalent to an acknowledgment on
his part that the work has been done substantially as required by the contract,
yet this rule is not applicable to hidden defects. (Chan Suanco
vs. Alonso, 14 Phil. Rep., 517.) . From the very nature of things it is
impossible to determine by the simple inspection of a concrete wall, floor, or
platform whether it has been made of reinforced concrete, for the reason that
this work is done by embedding iron or steel rods in the concrete in such manner
as to increase its strength.

Article 1591 of the Civil Code provides that the contractor shall be liable
for the damages that occur in case the building should collapse within the
period of prescription, on account of defects in the work. In his commentaries
on this article, Manresa says (vol. 10, p. 700 [Ed. of 1908, p. 754]) :

“The reason for the provision is very clear. The delivery of the thing and
the examination made of it are not sufficient to warrant the supposition that
the lessee had an opportunity to arrive at a perfect knowledge of all the
defects the thing may contain. On the contrary, rather is it probable that such
defects will not be manifest at first, and that they can be detected only by the
lapse of time. As this consideration forces itself upon us from the very nature
of things, it is both prudent and just to fix a period of time during which the
lessor may be held to account, and not to conclude that the fact of the
acceptance implies, on the part of the lessee, a waiver of actions which, at
that moment, it cannot be known whether or not he will have occasion to
bring.”

The appellant argues that this article is not applicable inasmuch a& it
was not proven that the defect in the work, consisting in the defendant’s
failure to comply with the terms of the building contract, was one that caused a
total destruction of the work. This argument is based on a literal construction
of the words se arruinase [should collapse] which appear in article
1591. We can not agree with the appellant. It may often happen that, upon the
discovery of some defect in a building, due to improper construction, if the
defect is promptly repaired great damage to the building may be averted at a
relatively small cost, while, if neglected, it may in time be the cause of the
total destruction of the building. According to the theory of the appellant, if
the owner folds his arms and allows the building to crumble, he may, when it has
been entirely destroyed collect its whole value from the contractor; but if he
immediately takes the necessary measures to repair the defective construction
and in this wise restrict the amount of the damage, the expense thereby incurred
must be borne by himself. The mere enunciation of this proposition is enough to
show its absurdity. On the contrary, it is the duty of the contracting party
injured by a breach of contract, to exercise reasonable care and diligence to
avoid loss and minimize the resulting damage. (8 R. C. L., 442.)

The judgment of the court below is affirmed, with the costs of both instances
against the appellant. So ordered.

Arellano, C. J., Torres, Johnson, Street, and Malcolm, JJ.,
concur.