DPWH DEPARTMENT ORDER NO. 80, April 03, 1990

INCLUSION OF THE MINIMUM MATERIALS TESTING EQUIPMENT IN THE PREQUALIFICATION OF CONTRACTORS

National Administrative Register April 3, 1990
Download PDF Source



In consonance with PD 1594 and its Implementing Rules and Regulations
as Amended 13 April 1988, relative to the prequalification of
contractors, and supplementary to Department Order No. 38, series of
1987, regarding minimum equipment requirements, henceforth, the
evaluation of the contractor’s technical capability and financial
capacity by the Prequalification, Bids and Awards Committee shall
include the minimum materials testing equipment to effectively ensure
the incorporation of the right quality of materials in the projects.

This minimum materials testing equipment requirement shall be on a
“per contractor” basis, and not on a “per project basis, i.e., the
equipment may be used to service several on-going projects of the
contractors.

Annexes 1, 2 and 3 (not included here) present the list of the
Minimum Materials Testing Equipment for Small, Medium and Large
Contractors, respectively, as categorized under Department Order No. 41,
Series of 1987, which will form part of the evaluation of the
Contractor’s capability.

As such, the list of major materials testing equipment in running
condition owned by Contractor, supported with proofs of ownership, shall
be added under Item 2 (Equipment) of the Technical Aspects, as
indicated in the prescribed format for the Contractor’s confidential
Prequalification Statement (Phase 1).

This order shall take effect immediately.

Adopted: 3 April 1990

(SGD.) FIORELLO R. ESTUAR
Secretary