IMPLEMENTING RULES AND REGULATIONS (IRR) ON THE CONDUCT OF INSPECTION, VERIFICATION AND APPROVAL OF SURVEY (IVAS) IN THE PHILIPPINE REFERENCE SYSTEM OF 1992 (PRS92)
No. 45, series of 1993 entitled “Adopting the Philippine Reference
System of 1992 as the Standard Reference System for Surveys in the
Philippines”, as amended by Executive Order Nos. 280 and 321, DENR
Administrative Order No. 2005-13, the “Revised Guidelines for the
Implementation of the Philippine Reference System of 1992 (PRS92)”, and
DENR Administrative Order No. 2007-29, the “Revised Regulations on Land
Surveys”, the following rules and regulations on the conduct of
inspection, verification and approval of survey (IVAS) are hereby issued
for the guidance and compliance of all concerned.
Section 1. Basic Policy. It is the policy of the
State to accelerate land surveys in the entire country through effective
and efficient adjudication and disposition of alienable and disposable
lands of the public domain and other lands reserved or utilized by other
government agencies.
Sec. 2. Objectives. This Order aims to:
(a) prescribe rules and regulations that will result in an efficient
processing of survey returns with non-compliant data submitted to the
DENR for verification and approval;(b) provide procedures that will supplement the present IVAS methods
in the processing of submitted survey returns; and(c) provide procedures to review Global Positioning System (GPS)
observations for lot surveys including applicable transformation methods
from local or arbitrary datum to the PRS 92 datum.
Sec. 3. Scope and Coverage. This Order shall cover
all survey returns of all isolated surveys pursuant to DAO No. 2007-29
as follows:
a. Group Settlement/Townsite Subdivision Surveys
b. Public Land
Surveys
c. Amendment Surveys
d. Private Land Surveys
e. Government Land Surveys(i) Friar Land Estate Surveys
(ii) National Government Lands Surveys
(iii) Local Government Units (LGU) Lands Surveysf. Conversion Surveys
g. Other Land Surveys not included in the above list and intended
for a specific purpose.
Sec. 4. Definition of Terms. The following terms as
used in this order are hereby defined as follows:
(a) Amendment Surveys – surveys covering untitled/undecreed
properties by changing the number of lots therein without affecting the
original technical descriptions of the boundary.(b) Common Points – points with known positions in terms of both the
local survey system and the PRS92 system.(c) Conversion Surveys – surveys conducted to transform/convert the
lots covered by approved graphical cadastral surveys, cadastral mapping
(Cadm) and photocadastral mapping (PCadm) into numerical or regular
cadastral lots with computation and plotting in the system of the
cadastral project.(d) Friar Land Estate Surveys – surveys of lands purchased by the
government from Religious Orders and private corporations from 1904 to
1913 for distribution to actual occupants and bonafide settlers pursuant
to Act 1120, “Friar Lands Act”.(e) Geodetic Engineer (GE) – a natural person with professional
expertise in the field of surveying and mapping, either in the
government service or in the private practice, and who has been issued a
Certificate of Registration and Identification Card by the Professional
Regulation Commission (PRC) – Board of Geodetic Engineering, pursuant
to Republic Act 8560, otherwise known as the Philippine Geodetic
Engineering Act, as amended by RA 9200.(f) Global Positioning System (GPS) – the satellite-based system of
determining positions and elevations of points on the Earth’s surface
with the World Geodetic System of 1984 (WGS84) as datum.(g) Government Land Surveys – surveys of parcels of lots administered
by or belonging to the National Government or any of its branches and
instrumentalities, and include friar land estate survey, national
government land survey and Local Government Unit (LGU) land survey.(h) Group Settlement/Townsite Subdivision Surveys – subdivision of
A&D lands not exceeding 1,500 hectares into 50 parcels or more.(i) Integration – the process of transforming and consolidating land
survey data sets into PRS92 and includes inventory of survey data,
physical recovery of location monuments or lot corners, observations of
the positions of recovered monuments or corners, and generation of
transformation parameters.(j) Isolated Surveys – shall refer to all classes of surveys of
isolated parcels of land used for agricultural, residential, commercial,
resettlement, or other purposes covering areas not exceeding 1,500
hectares.(k) Local Government Units (LGU) Lands Surveys – surveys of lands
acquired by provinces, cities/municipalities, or barangays, pursuant
to RA 7160, “Local Government Code of 1991” and other pertinent laws not
needed for public purposes.(l) National Government Lands Surveys – surveys of all patrimonial
properties owned by the government not intended for public use(m) Philippine Reference System of 1992 (PRS92) – the modified Luzon
datum used as reference system for all surveys in the Philippines
pursuant to Executive Order (EO) No. 45, series of 1993, as amended by
EO No. 321, series of 2000, and EO No. 280, series of 2004.(n) Private Land Surveys – surveys covering lands claimed or owned by
an individual, a partnership, a corporation, or other organization,
undertaken for purposes of original or subsequent land registration.(o) Public Land Surveys – all original surveys covering A&D lands
not subject to private rights nor devoted to public use pursuant to
provisions of public land laws.(p) Reference Point – a point on the ground with established position
(geographic and rectangular grid coordinates) established by traverse,
triangulation, trilateration, Global Positioning System (GPS), or any
combination thereof, and also known as Control Point, and marked on the
ground by a survey monuments commonly known as Location Monument.(q) Survey Plan – a two-dimensional map which depicts the lengths and
directions of lines, polygons and boundaries as well as the relative
horizontal positions of any existing structures on a land parcel.(r) Survey Returns – the collective documents submitted by a Geodetic
Engineer (GE) as a result of his/her survey and include primarily
computations, reference data, maps, resulting plan and supporting legal
documents as necessary.(s) Transformation – the process of converting survey data from one
coordinate system to another or from one datum to another; e.g.,
converting local coordinate systems of lot surveys into the PRS92
Philippine Plane Coordinate System (PPCS) – Philippine Transverse
Mercator (PTM) Projection, on converting from WGS84 to PRS92 datum.(t) Transformation Parameters – a set of numerical values defining
the mathematical relationship between two sets of coordinates or datum.(u) WGS-PRS92 Transformation Parameters – the parameters needed to
transform GPS observations in the World Geodetic System of 1984 (WGS84)
datum into the Philippine Reference System of 1992 (PRS92) datum,
consisting of three (3) translations or shifts, three (3) rotations and
scale, namely:
- Translation, or shift, parameters
- X = 127.62195 meters
- Y = 67.24478 meters
- Z = 47.04305 meters
- Rotation parameters
Rx = -3.06762”
Ry = -4.90291”
Rz = -1.57790”- Scale parameter = 1.06002
(Signs are reversed when transforming from PRS92 to WGS84; source:
NRMDP Publication)(v) Verification – the process of checking the completeness of survey
data such as field notes or digital data (whichever is applicable) and
accuracy of the results with respect to established standards such as
errors of closure (linear, azimuth) and relative precision in accordance
with the provisions of the Revised Manual for Land Surveys in the
Philippines and related Implementing Rules and Regulations.
Sec. 5. Revised IVAS Work Flow. The following
revised IVAS work flow (attached as Annex A*) shall be followed:
(a) Submission of survey returns by licensed Geodetic Engineers or
other government agencies for verification and approval;(b) Preliminary examination of the survey returns to determine
completeness and adherence to survey standards;(c) Assessment of fees (verification, preparation and other fees),
designation of kind of survey, assignment of survey number, and
recording and indexing;(d) Digital projection of submitted survey returns on the proposed
Land Information Map (LIM) by the Projection Unit;(e) Verification of computations (boundary, reference, astronomical
observations, traverse, recovered corners/common points, lot data, lot
corner settings) by the Computation Unit;(f) Verification by the Computation Unit of GPS-related observations
including supporting documents such as:(i) GPS receiver registration and calibration
(ii) GPS data including raw GPS observations in appropriate format,
fully accomplished field sheets, descriptions of all PRS92 control
stations used, and brand, model and serial number of GPS receivers and
antennas.(g) Verification of the transformation accuracy including number,
distribution and accuracy of recovered “common points” and the
transformation technique adopted.(h) Verification of prescribed scale, centerline coordinates and
plotting, adherence to cartography standards, completeness of features
on plan, and completeness of notation and other survey details by the
Cartography Unit;(i) Final examination of the survey returns by the Chief of Section
(Aggregate Surveys or Original and Other Surveys);(j) General review of the survey returns and recommendation by the
Chief of the Survey Division; and(k) Approval of survey returns by the Regional Technical Director
(RTD).
Sec. 6. Supplementary IVAS Procedures for non-compliant
survey returns. The following supplementary IVAS procedures
shall be adopted for non-compliant survey returns based on conventional
survey equipment:
(a) Checking and evaluation of GPS survey returns in accordance with
relevant provisions of Department Administrative Orders 98-12 (Manual
for Land Surveys), Administrative Order No. 2005-13 and Administrative
Order No. 2007-29;(b) Verification of the accuracy of the transformation including
number, distribution and accuracy of recovered “common points” and the
transformation technique adopted; and(c) Digital projection of submitted survey returns on the proposed
Land Information Map (LIM)
Sec. 7. Survey returns for isolated surveys. Survey
returns for isolated surveys shall be submitted together with the
following documents accomplished in the LMB prescribed form as provided
under DAO 2007-29.
a. Letter of transmittal enumerating therein the documents being
submitted as part of the survey returns and signed and sealed by the
Geodetic Engineer;b. Original drafting film plan, complete in details, indicated by
appropriate conventional symbols signed and sealed by the Geodetic
Engineer;c. Copy of the latest tax declaration (when applicable);
d. Original field notes and field notes cover, duly notarized;
e. GPS survey returns in digital format;
f. PRS92 control map duly signed by the Chief of Party containing the
following:i. PRS92 control points used in the project;
ii Tabulation of coordinates of control points;
iii. Map scale;
iv. Project boundary including locality;
v. Adjoining lots with corresponding survey numbers;
vi. Prominent natural and man-made prominent features;
vii. Area;
viii. Project Number; and
ix. Dates of survey and submissiong. Survey notification letter(s);
h. Lot data computations;
i. Traverse computations;
j. Astronomical observation computations;
k. GE Certificate, duly notarized;
l. Certificates of Instrument Registration (GPS/Total Station)
m. Digital copy of all applicable survey returns
n. Certificate of title duly certified by the Register of Deeds (ROD)
concerned.
Sec. 8. Verification of Survey Returns. Survey
returns and other related documents enumerated under Sec. 7 shall be
verified by the supervising DENR GE. The supervising DENR GE shall stamp
or write his/her name and affix his/her signature in all pages of the
field notes, computation sheets, lot descriptions and other related
submitted documents during the process of verification. After
verification and if the required documents are found to be in order, the
Chief of Regional Surveys Division shall sign the survey plan(s) and
other necessary endorsement letter to the RTD for Lands for approval.
However, if any of the documents is incomplete and inaccurate, the GE
who conducted the survey shall be informed immediately in writing by the
RTD for Lands.
Sec. 9. Criteria for the Recovery of Control Stations or Lot
Corners for Transformation. The following provisions shall
guide the recovery of control stations and lot corners for
transformation to PRS92:
a. Transformation accuracy is generally determined by the following
factors, namely;
- Number of common points;
- Distribution of common points around the project area;
- Accuracy of positions of common points; and
- Transformation technique adopted
b) The provisions of DENR Administrative Order No. 98-12 (Manual for
Land Surveys) pertaining to the “common point” should be complied with.
In general, the higher the accuracy required, the more common points are
needed. If the local survey network is consistently and homogeneously
accurate, a single common point will be sufficient to determine the
shift of the local network to PRS92. However, this is a highly unlikely
scenario and the more irregular the local survey network, the more
common points will be required.c) To provide redundant measurements for a least squares solution of
the transformation parameters, it is always best to recover and observe
more than the minimum number of common points per survey project.
Generally, a minimum of six (6) recovered control points per survey
project will be sufficient to generate the transformation parameters on
the assumption that these points are well distributed around the project
area and have homogeneous accuracy. Redundant points will provide a
clearer picture of the consistency of the survey network and the derived
transformation parameters.d) A number of the redundant common points can serve as “check
points”, i.e., points reserved from the initial transformation modeling
and later used as independent check of the quality of the transformation
process by comparing actual and transformed positions. If the
difference between the actual and transformed positions (residuals) is
not acceptable, any of the following three courses of action may be
done:
- Repeat the process of deriving the transformation parameters
using a different set of “common points”- Recover and observe more “common points”
- Use a different transformation technique
Sec. 10. Positions of Common Points. To locate the
positions of control points and lot corners in open, vegetated and other
areas, the use of the following survey equipment is recommended:
a) If the recovered survey stations or lot corners are located in
open areas (i.e., line-of-sight to GPS satellites is at least 150 above
the horizon around the point), GPS receivers may be used to locate their
positions. These geocentric GPS observations based on the World
Geodetic System of 1984 (WGS84) are later converted to geodetic PRS92
coordinates using a 7-parameter transformation formula. The line-of-sight criterion is a requirement for GPS observations to minimize or
eliminate multipath error that results to an erroneous distance between
the satellite and the receiver due to intervening structures (such as
buildings, houses, fences), trees or towers or antennas.b) If a control point or lot corner is covered by vegetation or is
adjacent to structures, towers, or fences higher than the tripod-mounted
GPS receiver, it is recommended that its position should be located
using an electronic total station either by traverse from an existing
control network or by a side-shot from the nearest GPS station
established in an open area.
Sec. 11. Transformation Formulas. The Helmert’s four-parameter
equation and the Affine transformation shall be used to transform to PRS
coordinates.
a) One mathematical model that can be used for transformation is
Helmert’s four-parameter equation involving rotation, scaling and
translation to preserve the shape of the lot or feature being
transformed. This is a linear conformal transformation with translation,
or shift, based on the following mathematical model:A * X + B * Y + CE = E
-B * X + A * Y + CN = Nwhere A, B = scale and rotation constants
CE , CN = translation, or shift, constants
X, Y = PPCS-TM/Luzon 1911 coordinates
E, N = PPCS-TM/PRS92 coordinates(Note: PPCS-TM refers to the Philippine Plane Coordinate System in
the Transverse Mercator Projection)The number of unknown parameters is four (A, B, CE and CN ) while the
number of equations is two per control point. Therefore,
mathematically, two control points will solve the parameters. However,
more than two points are needed for error adjustment using the least
squares method.
b) Another mathematical model is affine transformation with six
unknown parameters and, mathematically, can be solved using three
control points. However, for increased accuracy, more than three points
should be recovered. Affine transformation uses the following model:
A * X + B * Y + CE = E
-D * X + F * Y + CN = Nwhere A, B, D, F = scale and rotation constants
CE , CN = translation, or shift, constants
X, Y = PPCS-TM/Luzon 1911 coordinates
E, N = PPCS-TM/PRS92 coordinates
Sec. 12. Supplementary Regulations. Whenever
necessary, the Supervising Undersecretary, upon the recommendation of
the Director of the Land Management Bureau (LMB), shall issue additional
or supplementary regulations for the effective implementation of these
guidelines.
Sec. 13. Penalties. Any violation of any provision
of this IRR by a Geodetic Engineer or survey contractor shall be
sufficient ground for non-acceptance of the survey returns submitted for
verification and/or approval and shall be dealt with accordingly
pursuant to Section 73 to 80 of DAO 2007-29.
Sec. 14. Repealing Clause. Any provisions of
previous DENR orders, memorandum circulars and other issuances
inconsistent herewith are hereby accordingly superseded, amended or
repealed.
Sec. 15. Effectivity. This Order shall take effect
fifteen (15) days after its publication in a newspaper of general
circulation and upon acknowledgment of receipt of a copy thereof by the
Office of the National Administrative Register (ONAR).
Adopted: 18 June 2010
(SGD.) HORACIO C. RAMOS
Secretary
* Text Available at Office of
the National Administrative Register, U.P. Law Complex, Diliman, Quezon
City