G.R. No. L-21460. April 30, 1966
AMERICAN MACHINERY & PARTS MANUFACTURING CO., INC., PLAINTIFF AND APPELLANT, VS. MANILA RAILROAD COMPANY, ET AL., DEFENDANTS AND APPELLEES.
REYES, J.B.L., J.:
Direct
appeal, on a question of law, from the decision of the Court of First
Instance of Manila, in its Civil Case No. 46086, dismissing, after
trial, the complaint of the plaintiff-appellant, American Machinery
& Parts Manufacturing Co., Inc., consisting of nine (9) causes of
action against the defendants-appellees, Manila Railroad Company and
Manila Port Service, for short-delivery of consigned merchandise.
All
of the causes of action, except the ninth, which is for attorney’s
fees, correspond to each claim of the plaintiff against the defendant
Manila Port Service, as contractor of arrastre service, and Manila
Railroad Company, its mother-company, for the value of each
short-delivery in each of the eight (8) shipments of various
merchandise landed in the port of Manila and consigned to the plaintiff.
The
existence of the shortages and their value were uncontradicted, and the
trial court found that the several shipments were unloaded from the
carrying vessels without any deficiency and were received by the
appellee arrastre-operator, and that the shortages were not due to loss
in transit from the pier to the factory of the plaintiff.
The
last package of the first shipment was discharged on 30 September 1959
from the SS “Ventura”; plaintiff filed a provisional claim with the
Manila Post Service on 22 October 1959, followed by a formal claim on
12 February 1960 for the shortage of 70 pieces of D-7 Carriers, worth
P370.25.
The last package of the second shipment was
discharged on 11 November 1959 from the SS “Munsen”; plaintiff filed
its provisional claim on 24 November 1959, followed by a formal claim
on 19 February 1960 for the shortage of 114 pieces of Grouser Plates
TD-18-A, worth P98.77.
The claim for the shortage on the third shipment was fully paid.
The
last package of the fourth shipment was discharged on 27 October 1959
from the SS “Bayernstein”; plaintiff filed its provisional claim on 13
November 1959, followed by a formal claim on 19 February 1960 for the
shortage of one (1) piece of seamless steel tube, valued at P599.06.
For
the shortage worth P509.47 on the fifth shipment, P275.05 had been
paid. Provisional claim was filed on time (Rec. on Appeal, p. 76).
The
last package of the sixth shipment was discharged from the SS”Idaho” on
14 July 1960; plaintiff filed its provisional claim on 21 July 1960,
followed by a formal claim on 7 September 1960 for the short-delivery
of 32 pieces of end collars worth P177.52.
The last package
of the seventh shipment was discharged from the SS “Bonneville” on 17
February 1960; plaintiff filed its provisional claim on 22 February
1960, followed by a formal claim on 12 September 1960 for the shortage
worth P58.51 for 10 pieces of end collars.
The last package
of the eighth shipment was discharged from the carrying vessel, SS
“Pioneer Moor”, on 5 December 1959; provisional claim was filed on 17
December 1959, followed by a formal claim on 7 September 1960 for the
shortage of 1,100 pieces of bolts, worth P2,741.80.
The
claims for the above shortages were rejected by the trial court, as
aforesaid; hence, the plaintiff-appellant interposed this appeal on the
lone assignment of error that—
“the trial
court erred in holding that the failure of plaintiff-appellant to file
claims with complete supporting papers within fifteen(15) days after
the date of the last discharge from the vessel was fatal to its
aforesaid claims.”
In
brief, the trial court considered the provisional claims as not a
“claim for the value” of the goods, within the meaning of Section 15 of
the arrastre management contract between the Bureau of Customs and the
Manila Port Service, because the provisional claims did not state what
merchandise were short-delivered, much less their value, and were not
accompanied by the bill of lading, commercial and consular invoices and
the packing list, and, therefore, the fifteen-day period counted from
the discharge of the last package from the carrying vessel within which
to file claim, as provided in the said contract, which binds the
consignee, was not complied with.
The said section stipulates:
“15.
x x x x x in any event the CONTRACTOR shall be relieved and released of
any and all responsibility or liability for loss, damage, misdelivery,
and/or non-delivery of goods, unless suit in the court of proper
jurisdiction is brought within a period of one (1) year from the date
of the discharge of the goods, or from the date when the claim for the
value of such goods have been rejected or denied by the CONTRACTOR,
provided that such claim shall have been filed with the CONTRACTOR
within fifteen (15) days from the date of discharge of the last package
from the carrying vessel, x x x x x.”
A sample of the provisional claims is copied hereunder:
“Manila, Oct. 21, 1959 Reg. No. 1348 m PROVISIONAL CLAIM No. 2199-A S/S Ventura
MESSRS. Manila Port Service AGENTS, S.S. Port Area, Manila Gentlemen: We
beg to advise you that the following packages ex the above steamer have
been (Shortlanded-Landed in a bad condition) and provisional claim is
hereby made for any shortage or damage that may after examination be
found to exist.It
is respectfully requested that investigation be made immediately in
order to determine responsibility for same and written report will be
greatly appreciated.Very respectfully, G. M. CANSIPIT, INC. By: (Sgd.) (Illegible) Agent B/L CONSIGNEE MARKS & Nos. CONTENTS DAMAGE CLAIMED 7 American Mach. & Parts Mfg. Inc. AMPARTS 50 drums shortlanded Manila east iron castings PRO. No. 2441 ENTRY No. FROM: Oregon NOTE: The
above is a copy of claim filed this date with the above-mentioned
STEAMSHIP AGENT. Any further steps looking towards collection of
Shortage or damage should be taken by you.”
As per above sample, the provisional claims
substantially satisfied the “claim for value” required to be filed in
section 15 of the management contract. As recently held by this Court
in the case of State Bonding & Insurance Company vs. Manila Port Service and/or Manila Railroad Co., L-21833, promulgated on 28 February 1966:
“Although
without statement as to amount and without accompanying documents, the
provisional claims herein involved contained descriptions of the
importations concerned, sufficient to allow the Manila Port Service
reasonable verification. It would not have been difficult for defendant
Manila Port Service to check on whether some or all of cargo therein
described were in fact missing or in bad order. For it is supposed to
have a complete and detailed recording or checking of said cargo
(Section 5 of Arrastre Management Contract, Exh. 1). The particulars of
the precise amount of indemnity claimed as well as the supporting
papers for said claim were properly reserved for the formal claim
thereafter filed, since the determination and preparation of the same
by the consignee should be done carefully and without haste. The
provisional claims in question therefore served the purpose of enabling
the arrastre operator to check the goods in its possession, shortly
after they had been discharged from their carriers.”
Since,
in the instant case, provisional claims were filed within the period of
fifteen days from the discharge of the last package from the carrier in
all the shipments in question, except the first and fourth, the
consignee had complied with the period of limitation stipulated in the
contract.
For the foregoing reasons, the appealed decision is
hereby reversed and another is hereby entered condemning the defendants
to pay unto the plaintiff-appellant American Machinery & Parts
Manufacturing Co., Inc., the following sums:
(1) P98.77 on the second cause of action;
(2) P234.42 on the fifth cause of action;
(3) P177.52 on the sixth cause of action;
(4) P58.51 on the seventh cause of action; and
(5) P2,741.80 on the eighth cause of action.
Costs against the defendants-appellants.
Bengzon, C.J., Bautista Angelo, Concepcion, Barrera, Regala, Makalintal, Bengzon, J.P., Zaldivar, and Sanchez, JJ., concur.