NEW CARGO HANDLING TARIFF FOR THE PORT OF GENERAL SANTOS AT PAR WITH THE RATES OF PORT OF DAVAO
Pursuant to PPA Board of Directors
Resolution No. 1892 dated 28 November 2001, approving the request of
South Cotabato Integrated Port Services, Incorporated (SCIPSI) for an
adjustment in cargo handling rates at the Port of General Santos to be
at par with the rates of the Port of Davao, and the Implementing Order
of this Office under PMO Memorandum Order No. 01-2001 dated 21 December
2001, subject to publication in a local newspaper, which appeared on the
SUN STAR General Santos on 24 December 2001 and the MINDANAO BULLETIN
on 25 December 2001, please be informed that the adjustment in the cargo
handling rates at the Port of General Santos takes effect 09 January
2002, fifteen (15) days after the publication in the two (2) local
newspapers above-mentioned.
Please take note, however, of some errors in the printing, to wit:
Sun Star General Santos
H. Containerized Cargo
3. Shifting charges of containers within the same hatch or from one hatch to another or from one ship to pier or vice-versa,
Loaded Empty 10/20 footer Per Box . . . . . . . 492.50 should be . . . . 429.50
Mindanao Bulletin
H. Containerized Cargo
1. Full Container Load (FLC) Arrastre Stevedoring should be . . . . .(FCL) Loaded Empty 10/20 footer . . . . . . . . . . . . should be inserted: 35 footer Per Box 1358.50 787.00 798.00 40 footer P. Additional Charges — Meal Hour Charges (Work Through) Checker, Forklift Operators, Payloaders Operators . . . . . . Per Hour 58.90 Should be . . . . . 38.90
Attached is a copy of PMO Memorandum Order N0. 01-2001[1] for your reference.
Adopted: 07 Jan. 2002
(SGD.) PRUDENCIO B. MERCADO, JR.