DPWH DEPARTMENT ORDER NO. 161 S. 1992, October 23, 1992
ACTUAL/PHYSICAL VERIFICATION OF CONSTRUCTION EQUIPMENT
Wherefore, it is directed that in the pre-qualification of contractors, their equipment capability has to be actually/physically checked and verified, not only as to ownership, but, equally important as to the efficiency output of the equipment. Whoever conducts the actual/physical verification shall issue a certification containing his findings, with the corresponding recommendation for prequalification or pre-disqualification, as the case may be. Moreover, once a contractor has been awarded a contract, his units of equipment, as stated in his Pre-C application that would be utilized as required in the Instructions to Bidders, shall be checked as to whether they are the same equipment units that are deployed in the project.
This order shall take effect immediately.
Adopted: 23 Oct. 1992