PROCLAMATION NO. 889, January 21, 2020
CREATING AND DESIGNATING A BUILDING AND THE PARCEL OF LAND ON WHICH IT STANDS, LOCATED IN THE ARMED FORCES OF THE PHILIPPINES – RETIREMENT AND SEPARATION BENEFITS SYSTEM (AFP-RS…
Portion of Lot 2,
CCS-00-000467
A parcel of land (Portion of Lot 2 of the subdivision plan CCS-00-000467, being a portion of SWO-00-001302 LRC Rec. No.), situated in the Barangay of Western Bicutan, City of Taguig, Metro Manila, Island of Luzon.
Bounded on the NE., SE., SW., and NW., along lines 1-2-3-4-5-6-7-1 by Lot 2 CCS-00-000467.
Beginning at a point marked “1” on the plan, being S. 70 deg. 29′ W., 4401.13 m. from BLLM No. 1 MCadM 590-D, Taguig Cadastral Mapping;
| thence | S. 30 deg. 45’E., | 106.75 m. | to point 2; |
| thence | S. 59 deg. 15’W., | 37.21 m. | to point 3; |
| thence | N. 75 deg. 45’W., | 11.00 m. | to point 4; |
| thence | N. 30 deg. 45’W., | 2.61 m. | to point 5; |
| thence | N. 59 deg. 15’E., | 0.10 m. | to point 6; |
| thence | N. 30 deg. 45’W., | 96.35 m. | to point 7; |
| thence | N. 59 deg. 14’W., | 44.89 m. | to point of |
beginning; containing an area of Four Thousand Seven Hundred Sixty Two (4,762 m2) square meters, more or less. All points referred to are indicated on the plan and are marked on the ground by PS cyl. conc, mons 15 x40 cms., Bearings True; Date of the actual survey: 14 July 2017 and that of the consolidation subdivision survey: 22 December 2017, executed by Geodetic Engineer Kenneth Mark S. Lasala and certified correct by Ignacio R. Almira, Chief, Surveys and Mapping Division, Land Management Services, Department of Environment and Natural Resources.
IN WITNESS WHEREOF, I have hereunto set my hand and caused the seal of the Republic of the Philippines to be affixed hereto.
DONE in the City of Manila, this 21st day of January of our Lord, Two Thousand and Twenty.
(SGD.) RODRIGO ROA DUTERTE
By the President:
(SGD.) SALVADOR C. MEDIALDEA
Executive Secretary